Initiatives & Releases

Release 13.1

This section provides an overview of the available system documentation.

Network Access


Sep 01, 2025

N7 Network Access Guide v.2.7

This document provides details on the network access options for T7 and Eurex Clearing's interfaces. It includes detailed technical background information, such as router equipment information and port numbers for the configuration of firewalls.

Download

Sep 01, 2025

T7 Disaster Recovery Concept 2025 - Interface Configuration Details v.1.2

This document provides an overview of Deutsche Börse’s disaster recovery concept for the T7 trading system. It contains the required technical background information as well as functional features and limitations to enable participants to continue trading in a DR situation.

Download